BUILDING OUTLINE
Upper Level Office Zone
The middle and high floors are approximately 530 tsubo of well-shaped space. Flexible layout is possible.
Metro Square
2F~4F Otemachi Sankei Plaza
Eleven large and small rental meeting rooms cover a wide range of your needs like various conferences, meetings, exhibitions and corporate parties.
B2〜1,2,6F Shops,Restaurants,Clinic
The building offers stores, restaurants and clinics (general practitioner and dentist) to help improve the convenience of workers.
Exit guidance
-
Property Outline
- Location
- 1-7-2 Otemachi, Chiyoda-ku, Tokyo
- Completion
- First phase construction September 2000,
Second phase construction September 2002 - Building owners
- The Sankei Building Co., Ltd.
- Design supervision
- Mitsubishi Estate Co., Ltd.
- Architect and Contractor
- Takenaka Corporation
- Construction
- Takenaka Corporation and Kitano Construction Corp joint venture
- Site area
- 6,262.42㎡
- Zoning district
- Commercial zone
- Fire protection district
- Fire preventive zone
- Utility and function
- Office, hall, retail/service establishment
- Structure type
- Steel construction, steel-frame reinforced concrete structure and reinforced concrete structure
- Number of floors
- 4 underground floors, 31 above ground floors and 2 penthouse floors
- Maximum height
- 146m
- Building area
- 2,958㎡
- Building coverage ratio
- 47.24%
- Total floor area
- 83,298.65㎡
- Total floor space for lease
- 75,144㎡
- Floor space index
- 1,199.93%
- Floor height
- 3,950mm(standard floor)
- Exterior finishing
- Aluminum glass curtain wall, Low emissivity insulating glass(Low-e type)
- Parking area capacity
- 196 spaces(Drive-in type 116 spaces, mechanical type 80 spaces)
-
Facilities Outline・Electric installation
- Power service
- 66 kV 2-circuit loop distribution
- Emergency power generator
- Gas turbine system For emergency, security,
and tenants’ use(Oil tank 55,000 liters total) - Electric lighting
- F Average illuminance 700 Lx(Hf inverter control)
- Receptacle load
- 60VA/㎡
- Security
- Card-key system
- Emergency Facilities
- Fire alarm, smoke detection system, emergency broadcast system,
sprinklers, etc
・Other settings- Bei elevator
- 16 passenger elevators, 2 emergency elevators and 1 combined passenger/
freight use elevator
-
Outlines of Standard Floor
- Standard floor area
- Office floor:1,737㎡ on the middle and 1,736㎡on the upper floors
Core room:35㎡ on the middle and 73㎡ on the upper floors - Floor load
- Floor load Office 500kg/㎡,
Core room 1,000㎏/㎡ - Ceiling height
- 2,700mm
- Interior
- Floor/Tile carpeting(Free access H/100mm)
Walls/Coated finish,
Ceiling/Stone wool soundproof boards(system ceilings)
Prize Winning History
- ・Good Design Award in Architecture/Environmental Design category in 2001, Japan Industrial Design Promotion Organization
- ・Chairman’s Award for Achievement in Recycling in 2001, Recycling Promotion Association
- ・Category in Building Mechanical Service System[2002]
- ・Good Design Award in Architecture/Environmental Design category in 2003, Japan Industrial Design Promotion Organization
- ・45th BCS Award in 2004, Building Contractors Society
- ・DBJ Green Building Certification for 2011 Assessment Rank: Gold, Development Bank of Japan